News
Lagos announces 15-day closure of Marine Bridge for maintenance repairs
The Lagos State Government has announced that the Marine Bridge in Ijora, Apapa Local Government Area, will be closed for 15 days to allow for essential maintenance works.
The disclosure was contained in a statement posted on the official X account of Hon. Oluwaseun Osiyemi, Commissioner for Transportation, Lagos State.
Motorists are advised to plan ahead and be patient while the Federal Ministry of Works, in coordination with Lagos State, carries out essential bridge maintenance.
“The Lagos State Government wishes to inform the general public that the Marine Bridge in Ijora, Apapa Local Government Area, will be closed for 15 days to allow for essential maintenance works,” the statement read in part.
It added, “Motorists are advised to be patient, as the closure is part of the traffic management plan for maintenance works on the underlying bearings of some sections of the Marine Bridge by the Federal Ministry of Works (Office of the Federal Controller, Lagos).”
Maintenance phases and traffic diversions
The statement further explained that the maintenance project will be carried out in two phases. Phase I, running from Saturday, 11th October to Saturday, 18th October 2025, will cover the area from the foot of Marine Bridge along Lawani Oguntayo Road near UBA, inbound toward Apapa and Costain.
- During this period, motorists traveling from Ijora Olopa to Apapa will be diverted via the Ijora Causeway Access Ramp near Omni Retail Company, continue to Ijora 7up, turn left onto the Lilypond Access Ramp, and proceed on their journeys.
- Phase II, from Sunday, 19th October to Saturday, 25th October 2025, will focus on the stretch between Ijora Badia and Lilypond Access Ramp, inbound toward Apapa.
- Motorists from Ijora Olopa heading to Apapa and Costain will be diverted about 50 meters before the work zone into a contraflow with Costain-bound traffic, rejoining the main carriageway after 500 meters.
Those traveling from Apapa toward Costain, Lagos Island, or Ijora Olopa will maintain through traffic but will also be redirected into a contraflow near the work zone for roughly 500 meters before resuming normal access.(Nairametrics)
-
News24 hours agoTimipre Sylva named as FG files 13-count charge against alleged coup plotters
-
News4 hours agoNo evidence of widespread COVID-19 transmission in Cross River – NCDC
-
News19 hours agoNigeria Records Fresh COVID Case
-
News6 hours agoJUST IN: Gov Yusuf Picks Garo As Deputy
-
News24 hours agoKaduna court adjourns el-Rufai’s bail hearing to June
-
World News19 hours agoNetanyahu Will Be Arrested, Says Hungary’s Prime Minister, Cites ICC Warrant
-
World News19 hours agoAmnesty International Accuses US, Israel, Russia, Allies Of Driving Global Genocide, War Crimes
-
Opinion19 hours agoNation in the Dark: Outrage as World Bank Flags Trillions Withheld Before Distribution, Nigerians Demand Answers, Presidency Under Pressure to Explain Transparency Crisis
